GC&P SAP Application Index
Public Hearing Notice September 14, 2020  
Facebook Live Stream https://www.facebook.com/WheelingWV
2014 Comprehensive Plan 2014 Comprehensive Plan (p. 55 Special Area Plan)  
Future Land Use Plan (Map 8)
WV State Code 8A-3-11: Amending Comprehensive Plan
Meeting Minutes August 12, 2019
October 21, 2019
November 21, 2019
December 16, 2019
January 6, 2020
February 3, 2020
March 2, 2020
April 6, 2020
May 11, 2020
June 8, 2020
Meeting Transcript October 21, 2019
December 16, 2019
February 3, 2020
March 2, 2020
April 6, 2020
May 11, 2020
June 8, 2020 
September 14, 2020
October 19, 2020
Zoom Video Meetings April 6, 2020     May 11, 2020     June 8, 2020
Staff Report August 12, 2019 meeting
Staff Report October 21, 2019 meeting
Staff Report November 18, 2019 meeting
Staff Report December 16, 2019 meeting
Meeting Update February 3, 2020 meeting
Staff Report March 2, 2020 meeting
Staff Report April 6, 2020 meeting
Staff Report May 11, 2020 meeting
Staff Report June 8, 2020 meeting    Geotechnical Report S&ME Engineering (final)
Staff Report July 13, 2020 meeting
Staff Report August 10, 2020 meeting
Staff Report September 14, 2020 meeting (public hearing)  meeting slides
Staff Report October 19, 2020
Comments
Dept. of Highways Correspondence Set 1       Set 1-2 (Dec.'19)  Set 1-3 (June 2020)
Dept. of Env. Protection Correspondence Set 2       Set 2-2 (Dec. '19)  Set 2-2 3&4 (Dec. '19)  City Solicitor (June 2020)
State Historic Preservation Correspondence Set 3
City of Wheeling Correspondence Set 4       Set 4-2 (March '20)
Applicant's Materials Correspondence Set 5 - see exhibits 9-12 and maps 70-87 below (Maps 88-95 Dec' 19)
Public Emails Correspondence Set 6 -   1    2    3    4    5    6    7    8    9    10    11    12 (updated 10/19/20)  
Letter of Transmittal (Exhibit 5)
Application
Exhibit 1a GACS and GC&P property list
Exhibit 1b GACS and GC&P property map
Exhibit 1c Neighboring property list
Exhibit 2 Comprehensive Plan Map 8 Future Land Use
Exhibit 3a Zoning Map (from WheelingWV.gov)
Exhibit 3b Property Information (also Map 69)
Exhibit 4a Aerial photo
Exhibit 4b Proposed Development w/ Grading & Cross Sections
Exhibit 4c Site Plan with parking count (same as Map 10)
Exhibit 5 Applicant's Letter of Transmittal to the Planning Commission
Exhibit 6 DOH letter
Exhibit 7 DEP letter
Exhibit 8 Marketing Materials
Exhibit 9   (October 2019) Development Summary
Exhibit 10 (October 2019) Sewage & Water
Exhibit 11 (October 2019) Geotechnical Summary - Thrasher
Exhibit 11a (March 2020) Geotechnical Report - Larson Design Group
Exhibit 12 (December 2019) Tax Estimate
Exhibit 13 (May 2020) Preliminary Land Development Permit Summary
Exhibit 14 (May 2020)
Exhibit 14A  (June 2020)
Traffic Impact Study
Mitigation Slide 9   
video
GC&P Petition Filing Letter (Oct. 16, 2020)

Map # Title
1 Cover Page
2 Early Site Plan
4 Site Pad E to W with preferred layout
4A Site Pad N to S with preferred layout
6 Site Plan = Preferred Layout
6A Site Plan with alternative entrance and parking area
7 Site Plan = C-2 alternative
8 Site Plan = residential / over retail alternative
9 Site Plan = res. or retail w/ parking compliance & green space alternative
10 Site Plan - 1,716 space parking compliance detail to code
11 Site Plan W to E 3D Preferred Plan
12 Site Plan E to W 3D Preferred Plan
13 Site Plan / Office and Institutional 3D
14 Site Plan / Residential 3D
15 Proposed Rt. 88 Corridor Improvement Plan
16 Conceptual design plan for Corridor Improvement Plan (showing 3 phases)
18 Corridor Improvement Plan phase I - aerial view of improvements
19 Corridor Improvement Plan Phase II - sidewalk/drainage aerial view
20 Corridor Improvement Plan Phase III - aerial view
21 Corridor Improvement Plan.  Typical sections Thrasher Engineering
22 Phase I Pads (Preferred)
22A Phase I Pads (Alternative)
29 Grading Plan (Cross Sections A, B & C) note water mitigate & eng. slope 2%
29A Grading Plan Section A (67' avg.)
29B Grading Plan Section B (70' avg.)
29C Grading Plan Section C (95.89 avg.)
30 Grading Plan Section C (95.89 avg.) 
31 Grading Plan Section C (95.89 avg.)
32 Grading Plan Section C (95.89 avg.)
36 Early Conceptual shows 4-5 AC pad, Phase 1 entrance alt.
39 Drainage Plan for 100' material removal (conceptual) (ponds hold water)
40 Grading Information    Avg. = 95.89'    Avg. Fill = 8.28
41 Grading Information   100' material removal    Avg. 45.92  Avg. Fill = 12
42 Old preliminary retail/outlet center
43 Old preliminary retail/outlet center with access road
45 Old preliminary plan
49 Final version of Old preliminary plan
50 251 unit residential plan
56 WVDEP grading plan for construction phase
57 WVDEP grading plan for first 100'
58 Overall earthwork by Thrasher (preferred plan)
60 Stormwater management plan. BWQ Sample Sites
61 Stormwater - pre/post-construction drainage area management plan
62 WV DEP permitted areas/core sample locations
63 Existing logging trails
64 Storm pond details
65 Sediment Control Plans for ponding design/implement stormwater mgt.
66 Initial grade and existing ponds
67 Proposed next level grading and ponds
68 Ohio County Oil & Gas location maps
69 Prior zoning map
70, 70a, 70b, 70c (October 2019) Map with Cross Sections and Line of Sight
80 & 80a (October 2019) Existing & Proposed Hydrology
81 (October 2019) Bird's Eye - West to East
82 (October 2019) Main Entrance
83 (October 2019) Main Entrance Elevated with Roads
84 (October 2019) Main Entrance Showing Pads
85 (October 2019) Bird's Eye - East to West
86 (October 2019) N.E. to S.W. Elevated View
87 (October 2019) N.E. to S.W. Side View with 2nd Entrance
88 (December 2019) Oglebay Corridor Entrance
89 (December 2019) Entrance Gate
90 (December 2019) Entrance N Side View
91 (December 2019) Entrance S Side View
92 (December 2019) Oglebay Corr. Overhead S View
93 (December 2019) Oglebay Corr Overhead SW View
94 (December 2019) Oglebay Corr. E Side View
95 (December 2019) Projected Overhead S Side View
96 (June 2020) Overall - Mine Map (No Buildings)
97 (June 2020) Overall - Mine Map ( With Buildings)
98 (June 2020) Overall - Grading Map (No Buildings)
99 (June 2020) Overall - Grading Map (With Buildings)